The location of the project lies within Pamukova between Adapazarı and Bilecik, near the Sakarya river. The power of the river type HEPP will be 3x3.1 MW. The power plant will be operated by the customer for 30 years and will be handed over to the state.
The project consists of the following parts:
Route | 569 m |
Total Excavation Amount | 238.000 m3 |
Total Fill Amount | 60.000 m3 |
Total Concrete Amount | 21.829 m3 |
Total Formwork Amount | 23.000 m2 |